three arm rock drilling trolley Research on Application Technology of Computer Three-arm Rock Drilling Trolley in Excavation of Jinping Tunnel In recent years, large-scale highway construction and development has become the main melody of the transportation sector, under this trend, the traditional tunnel construction technology can not meet the national environmental protection, low energy consumption, economy and high safety and quality
Chongli railway Chongli Railway Zhengpantai Tunnel Leveling Guiding Turning Zhengdong Three-arm Rock Drilling Rig Roof Lifting + Double Contact Channel Rapid Construction Technology With the increasing progress of large-scale mechanized construction of long tunnels, how to choose the matching three-arm rock drilling rig for excavation, how to use reasonable and optimized technical solutions to solve technical problems in various specific situations, and achieve the effect of
down-the-hole drilling rig Research and Application of Dry Dust Removal System for Surface DTH Drilling Rig The drilling process of mining brings a lot of dust pollution. Dust with particles smaller than 10 μm is difficult to settle to the ground after being discharged into the atmosphere, and has a strong adsorption force. Many harmful gases, liquids, and heavy metal elements can be adsorbed on it.
parts search 3128078411 Brand : EPIROCPart No. : 3128078411Description : Pull RopeUse in : Boomer L2c , Boomer L2d , Boomer M1d , Boomer Xe3 , Roc D7 , Roc D9 , Roc T35 , Roc T40
open pit mine Discussion on Management and Maintenance of DTH Drilling Rig in Open-pit Mine Many industrial raw materials and one-time energy sources are derived from mineral resources. The development and utilization of mineral resources has become a favorable support for domestic economic development. In the process of mining open pit mines, down-the-hole drilling rigs are usually used
Hydraulic rock drill Technical Transformation and Application of HLX5-type Hydraulic Rock Drill There are problems exsiting in a drilling process of hydraulic rock drill,for example,the front end cover becomes loose,rotary pressure can not be tested,impact piston strains and the drill does not impact.In order to improve drilling efficiency of imported drilling jumbo in downhole production
rock drilling jumbo Suitability analysis of two rock drills in operating process The performances of Rocket Boomer353 rock drilling jumbo and AMV21SGBC-CC full computer rock drilling jumbo are compared. Through the actual construction process, the applicability of the two kinds of rock drilling jumbo is analyzed.
railway tunnel Study on Identification Method of Tunnel Surrounding Rock Characteristics Based on Rock Drilling Jumbo Rock strength and surrounding rock integrity were the main parameters of tunnel surrounding rock classification. Aiming at the problem that the traditional acquisition methods of rock strength and surrounding rock integrity were not advanced and timeliness,a classification method of
Funiu Mountain Tunnel Application of new three arm rock drilling jumbo in extra long mountain tunnel excavation Based on the Funiu Mountain extra long highway tunnel project,the technical parameters and construction technology of the new three arm rock drilling jumbo are introduced in detail,and the advantages of the new three arm rock drilling jumbo in the construction of extra long tunnel by
parts search 86611647 Brand : MONTABERTPart No. : 86611647Description : Front LiningUse in : Hc 109 , Hc 150
underground rock drilling equipment Pollution and Control of Hydraulic System of Underground Rock Drilling Equipment During underground production in Huashugou mining area, the underground rock drilling equipment has the characteristics of poor operating environment, frequent action of various parts, high precision and complex system, which makes the oil products of the equipment hydraulic system
high altitude Application of Boomer 281 driving trolley in high altitude mining Jiama mine of Huatailong company,located in the snow covered plateau of Tibet,is one of the largest copper gold polymetallic mines in China.The bad weather conditions and low mechanization level are the bottlenecks restricting the rapid development of enterprises.In order to achieve large-scale