In the past days,while encountering bad geological conditions such as fault fracture zone or karst in rock class Ⅳ and Ⅴ sections,the traditional treatment method for tunnel is applying pipe roof and forepoling ducts first,then grouting those pipes and ducts to improve the tunnel stability