vertical shaft construction Application Practice of Drilling and Blasting Technology in Vertical Shaft Construction Taking the shaft construction of No. 2 return air shaft project as an example, based on the analysis of the mechanical conditions of the surrounding rock of the shaft, the paper puts forward the design principles of drilling and blasting parameters and the theoretical calculation basis, then
medium⁃length hole drilling jumbo Research on the Application of Remote Control System for Medium⁃length Hole Drilling Jumbo in Qianyanshan Iron Mine The remote control and even automatic operation of mining equipment is the core of realizing the intelligent construction of mines. In this paper, based on the rock drilling operation in the production area of the Yanyanshan Iron Mine with the sub⁃pillar caving method, the existing Simba1354 medium
Hydraulic rock drill Structure and Failure Analysis of Atlas COP1838ME Rock Drill The COP1838ME rock drill is a rock drilling equipment that has multiple functions such as impact, rotation, propulsion, and flushing. Taking the Atlas COP1838ME rock drill as an example, this article introduces the damage to the main components of the rock drill, analyzes the causes of damage to the
parts search 3115347385 Brand : EPIROCPart No. : 3115347385Description : Hydraulic MotorUse in : Cop 1238k , Cop 1838+ , Cop 1838hd , Cop 1838hd+ , Cop 1838he+ , Cop 1838mux , Cop 1838mux+ , Cop 1840+ , Cop 2550+ , Cop 2560 , Cop 2560+ , Cop Sc25
railway single-line tunnel Application of three-arm drilling trolley in efficiency improvement and excess consumption control of railway single-line tunnel construction Based on the application of the three - arm rock drilling trolley in the excavation and drilling construction of a single line railway tunnel, this paper controls the Angle of the excavation cut hole and the surrounding hole through the modification of the beam and the adjustment of the on-site
three arm rock drilling jumbo Research on the Application of Self Regulating Aerosol Slag Removal Technology of Three Arm Rock Drilling Trolley in Long and Deep Buried Tunnels With the continuous improvement of tunnel construction mechanization, three-arm rock drilling jumbos have been widely used. Their drilling method uses high-pressure wind and water for drilling and slag discharge. However, for areas lacking water or unstable rock formations when encountering water
rock drilling trolley Analysis and Scientific Maintenance of Hydraulic System for Rock Drilling Trolley Drilling In the field of specialized equipment for tunnel construction, the stable operation of rock drilling trolleys is an important factor affecting the progress of tunnel construction.The hydraulic system of the rock drilling trolley supports the operation of the entire equipment,and the failure of the
tunnel A Brief Analysis of the Full-Process Mechanized Supporting Construction Technology of Expressway Tunnels Taking the Chunmushan Tunnel of Zhitong Expressway as the background, the application of full-process mechanized equipment in expressway tunnels is introduced. The application of seven supporting tunnel construction process equipment (full-process mechanized equipment) including a two-arm rock
three-arm rock drilling rig Research on the Application of Three-Arm Rock Drilling Rig in Mountain Railway Tunnel Construction With the continuous development of social economy, the scale of tunnel construction in my country is becoming more and more complete. In fact, in order to ensure the personal safety of construction workers, ensure the safety and quality of tunnel construction, and effectively speed up the
three-arm rock drilling rig Research on Rapid Construction Using Three-arm Rock Drilling Rig At present, three-arm rock drilling rigs are often used during tunnel construction in my country. Due to the complex geological conditions of the surrounding rock at the construction site, and full-section construction is not carried out, the construction effect can be improved by supporting fully
railway tunnel Key Techniques and Equipments for Mechanized Construction of Drilling and Blasting Tunnel in Weak Surrounding Rock In order to apply mechanized drilling and blasting method for large-section tunnel construction in weak surrounding rocks, construction technologies of rock drilling and arch installation were studied based on Laifu tunnel of Chongqing-Kunming high speed railway. Through the renovation of the