The professional drilling jumbo's parts supplier

Research on Parameter Optimization for Mechanized Construction of Benching Tunnelling Method in Extra Large Section High⁃Speed Railway Tunnels
high-speed railway tunnel

Research on Parameter Optimization for Mechanized Construction of Benching Tunnelling Method in Extra Large Section High⁃Speed Railway Tunnels

Mechanization and intelligence are the development trends of drilling and blasting tunnel construction. The lack of coordination between construction methods or parameters and mechanical supporting operations restricts the improvement of mechanical construction efficiency. This article focuses on

Optimization and Simulation Analysis on Boom Mechanism and Hydraulic System of a Three⁃arm Rock Drilling Jumbo
three-arm drilling jumbo

Optimization and Simulation Analysis on Boom Mechanism and Hydraulic System of a Three⁃arm Rock Drilling Jumbo

The three⁃arm drilling jumbo is specialized equipment for hard rock tunnel construction using the drill⁃and⁃blast method. Its boom system is crucial for the extensive operational range of the end drill. Addressing the issues of easy vibration and large deformation in the boom system of the

  • LiGuangPeng
    LiGuangPeng
  • RuanLiChao
    RuanLiChao
  • LiHaoNan
    LiHaoNan
  • ChangWei
    ChangWei