rock drilling rig Application of Boomer k41 Drilling Rig in Xiadian Gold Mine The original mining equipment in our mine is relatively backward, the workers are labor-intensive, the driving efficiency is low, and the safety cannot be well guaranteed. For this reason, high-efficiency trackless mining equipment such as new hydraulic rock drilling rigs has been introduced
hydraulic drill jumbo Application of hydraulic drill jumbo to Dunde Mining Company The rock is hard in Dunde Mining Company,and the manual drilling is labor-intensive,the drilling efficiency low and the underground working environment poor. To ensure mine production capacity,and improve drilling efficiency and underground working environment,Dunde Mining Company has introduced
strong ground pressure Research on Filling Mining Method for Extremely Thick and Large Ore Bodies under Strong Ground Pressure Under the background that domestic mines are gradually shifting to deep ore body mining,in the face of the complex environment of“High ground stress,high ground temperature,high karst water pressure and strong mining disturbance” in deep well mining,this paper proposes a mining method of open field
parts search 3128303571 Brand : EPIROCPart No. : 3128303571Description : ProtectionUse in : Boomer 281 , Boomer 281dh , Boomer 282 , Boomer K111 , Boomer M2c , Boomer M2d , Boomer S1d , Simba H1257 , Simba S7d
railway tunnel Corporate Quota Determination and Analysis of Mechanized Construction of Railway Tunnels At present, the quota for mechanized supporting construction of railway tunnels is under refinement while corporate construction technology management and cost control are under exploration. In the paper, with the example of excavation, concrete spraying and other sub-measurement of mechanized
highway tunnel Tunnel Blasting Construction Technology Based on Atlas Boomer L2D Hydraulic Rock drilling Trolley The rock drilling trolley is a piece of typical mechanical equipment for tunnel construction. For the hard and complete surrounding rock conditions, the rock drilling trolley has high speed, low unit energy consumption, fewer employees, high safety and good blasting quality, which is the main
highway tunnel Analysis on the Configuration of Highway Tunnel Mechanized Construction Equipment In recent years, the construction level of tunnel engineering in my country has been improved, and related construction equipment has been continuously updated, which has provided a great impetus for the development of engineering construction. Reasonable configuration of mechanical
Sichuan-Tibet railway tunnel Suggestions and Considerations on Equipment Selection for Constructing Sichuan-Tibet Railway Tunnels at High Altitudes The construction of the Sichuan-Tibet railway faces numerous challenges such as significant terrain elevation differences, complex geological characteristics, and a harsh climatic environment, among which the high altitude has particularly significant effects on the Sichuan-Tibet railway
Nige Tunnel Application of Fully Computerized Three-arm Rock Drilling Jumbo in Construction of Expressway Tunnel In expressway construction, intelligent construction machinery and equipment are the best choice. Due to the unfavorable geological problems such as high ground temperature and rock burst, Boomer XL3D rock drilling jumbo, instead of manual drilling and blasting operation
parts search 86611647 Brand : MONTABERTPart No. : 86611647Description : Front LiningUse in : Hc 109 , Hc 150
Hydraulic rock drilling systems Configuration Analysis of Hydraulic Rock Drilling System Based on Multi-Objective Optimization The hydraulic rock drilling system is one of the important configurations in the operation of the hydraulic rock drilling rig. It is widely used in many fields such as mining. The operation efficiency and the life of the drill are affected by the hydraulic rock drilling system. This paper explores
tunnel construction Application Analysis of Drilling Rig Construction Technology in QiGanShan Tunnel With the continuous deepening of the concept of green development, the traditional tunnel construction technology has been unable to meet the needs of environmental protection and green construction. In this regard, the tunnel construction technology that adapts to the green development concept