shank adapter Failure Analysis andProcess Refinementfor ShankAdapteri of YGZ90 Rock Drill After testing the material, hardness, effective hardening layer thickness and metallurgical structure of the failed shank adapter on YGZ90 rock drill, it’s found that all indicators and parameters meet the quality requirements for the heat treatment. Based on the analysis of usage of the shank
hollow hole straight cut Application of Straight Cut Construction Technology in Large Section Tunnel With the continuous expansion of the construction market, the traditional manual drilling and blasting has gradually withdrawn from the application market, and the drilling jumbo has begun to show itself. Because the traditional inclined hole cutting drilling method has high requirements for the
dust removal system Study on dust removal system of DTH drilling machine In order to reduce the dust pollution produced by the down-hole drill in the working process, the dust removal system of the down -hole drill is designed. The working principle and composition of the dust removal system are introduced. The dust collection cover, cyclone dust collector, dust removal
parts search 3115276680 Brand : EPIROCPart No. : 3115276680Description : Seal Housing ComplUse in : Cop 1238 , Cop 1238k , Cop 1638 , Cop 1638hd , Cop 1838 , Cop 1838cr , Cop 1838hd , Cop 1838mux , Cop 1840 , Cop 2238 , Cop 2238hd
rock drill COP1838 Rock Drill Working Principle and Common Fault Analysis The three-arm hydraulic rock drilling jumbo is equipped with a high-performance imported rock drill. If the rock drill breaks down frequently during tunnel excavation, it will seriously affect the construction progress and increase the construction cost. This paper analyzes the working principle
rock drilling jumbo On-Site Maintenance of Boom Turning Cylinder of Rock Drilling Rig Rock drilling jumbo refers to the installation of one or several rock drilling machines on a special drilling arm. The chassis is a modern engineering machinery developed from a hand-held and towed chassis. It has fast drilling speed, good guidance, and strong operability. features. High operating
Tunneling jumbo DD210 Excavation Jumbo Mechanical Troubleshooting This paper aims at the common faults encountered in the production and use of the excavation jumbo, and analyzes the causes of the faults according to the sub-items of oil, wind and water.
large section tunnel Research and Application of Mechanized Construction Technology for Large Section Tunnel This paper mainly introduces the construction of the ZQ-2 section tunnel of the new Yichang Zhengzhou Wanzhou highspeed railway connecting line. Because the surrounding rock of the tunnel in this project is of low grade, the tunnel section is large and most of them are long tunnels, and the
approach Experimental study on approach excavation drilling blasting optimization in Jinfeng Gold Mine The rock quality in Jinfeng Gold Mine is overall poor, classified from extremely bad to medium. In light of the problems in the approach mining, such as the intense workload of roadway excavation, and poor excavation efficiency and quality, the excavation drilling blasting parameters are optimized
three-arm drilling jumbo Research on the application of three-arm rock drilling jumbo in tunnel excavation construction Based on the construction conditions and engineering characteristics of the Wujialiang super-long tunnel of Chengkai Expressway, this paper studies the mechanized excavation application of three-arm rock drilling rigs in high-risk long tunnels, and compares the cost of manual excavation
DD311 rock drilling rig Retrofit application of remote control system on DD311 rock drilling rig Aiming at the problem that the roof rockfall may become a safety hazard for the operators during the rock drilling process of the rock drilling rig, this paper analyzes and studies the control principle of the DD311 rock drilling rig, and develops a system based on wireless communication, video