The professional drilling jumbo's parts supplier

Research and Application of Large Machinery and Spatial Arrangement in SingleTrack Tunnels of High-Speed Rails
Single-track tunnel

Research and Application of Large Machinery and Spatial Arrangement in SingleTrack Tunnels of High-Speed Rails

Mechanized construction becomes the mainstream direction of future tunnel construction with its advantages of high efficiency and low costs. Based on the Qinling Taihang Mountain Tunnel Project, the large mechanical equipment used in various stages of drilling-blasting construction is sorted out

  • JinRui
    JinRui
  • ZhuYuanJun
    ZhuYuanJun
  • ZhaoRunLin
    ZhaoRunLin
  • HuHongWei
    HuHongWei
  • ZhangTianWang
    ZhangTianWang
  • HeWeiWei
    HeWeiWei
  • FuHongXian
    FuHongXian
Research on Configuration of Drilling and Blasting Excavation Equipment and Energy-Gathering Smooth Blasting Process for Dapanshan Tunnel of Hangzhou-Shaoxing-Taizhou Expressway
Dapanshan Tunnel

Research on Configuration of Drilling and Blasting Excavation Equipment and Energy-Gathering Smooth Blasting Process for Dapanshan Tunnel of Hangzhou-Shaoxing-Taizhou Expressway

The total length of Dapanshan Tunnel of Hangzhou-Shaoxing-TaizhouExpressway is 8635m,which is called "the first tunnel in East China".In order to solve the problem of excavation eficiency in the process of tunnel construction,Xuzhou XCMG Energy Equipment Co., Ltd.(hereinafter referred to as XCMG

  • ZhouZhongShang
    ZhouZhongShang
  • ZhangJiGuang
    ZhangJiGuang
  • ChenZhiJie
    ChenZhiJie
  • JiaoZhongXing
    JiaoZhongXing
  • YueTaiYu
    YueTaiYu