In order to ensure the safety and quality of the construction of Zhengzhou-Wanzhou high-speed railway tunnel and shorten the construction schedule of the tunnel,the large cross-section construction method by triple-boom rock drilling jumbo is put forward.And then proper transformations for the jumbo