Briefly introduce that in the construction of the Dapo Tunnel of the Guizhou-Zhangzhou-Changzhou Railway, the three-arm rock drilling rig is used as the carrier, and the principle of controlled blasting is applied. The drill and blast design has been implemented in terms of high-precision initiation