The article takes the Zhengwan high-speed railway 9 standard project as an example. This project successfully applied 10 three-arm rock drilling rigs for drilling and blasting excavation, especially in the exit section of Xingshan tunnel, and successfully applied to large sections of Ⅳ and Ⅴ