This paper mainly introduces the construction of the ZQ-2 section tunnel of the new Yichang Zhengzhou Wanzhou highspeed railway connecting line. Because the surrounding rock of the tunnel in this project is of low grade, the tunnel section is large and most of them are long tunnels, and the