Based on the application status of rock-drilling jumbo, in order to solve the problem of large average linear overbreak amount when drilling and blasting with rock-drilling jumbo, the section of grade Ⅲ surrounding rock (DK23 +075—DK23 + 155) at the left tunnel entrance of Taixingshan tunnel