Relying on the G15 Shenhai Expressway's expansion and reconstruction of the Xianjianling Tunnel (with a maximum excavation span of 22.8 m), a full-process mechanized equipment system called the “nine-set suite” was built, centered on smart rock drilling rigs, wet-spraying manipulators, and