This paper focuses on the mining tunnel of the Shenzhen-Huizhou intercity Dapeng branch line, and the goal is to analyze the technical feasibility and economic benefits of mechanized drilling and blasting method in the construction of mining tunnels.we worked to improve and adjust the blasting