Combined with Sujiayan Tunnel of Zhengzhou-Wanzhou High-speed Railway,a set of mechanized supporting and optimization schemes suitable for the excavation of a full section tunnel in weak surrounding rock is summarized.It can be obtained through field practice that improving the drilling-blasting