The professional drilling jumbo's parts supplier

Research and Prospect of Intelligent Construction Technology of Xi-Yan High-speed Railway Tunnel
Intelligent

Research and Prospect of Intelligent Construction Technology of Xi-Yan High-speed Railway Tunnel

This paper studies the intelligent construction technology of the Xi-Yan of the high-speed rail tunnel, analyzes the problems and challenges existing in the construction of the high-speed rail tunnel, introduces the application status of the intelligent tunnel construction technology, and puts

  • MaZhiZhong
    MaZhiZhong
  • PangXiaoLin
    PangXiaoLin
  • GuoKeYi
    GuoKeYi
  • WeiXiaoBo
    WeiXiaoBo
  • TianHaiYang
    TianHaiYang
  • ZhangShongTao
    ZhangShongTao
Seawater Corrosion Conditions Analysis and Anti-Corrosion Scheme Design for Rock Drilling Jumbo
seawater corrosion

Seawater Corrosion Conditions Analysis and Anti-Corrosion Scheme Design for Rock Drilling Jumbo

China's gold mines are mainly concentrated in Shandong's Jiaodong Peninsula, and its underground gold mines are affected by seawater corrosion, causing frequent failures and reduced service life of rock drilling jumbo, which significantly affects construction efficiency and production costs. As a

  • ZhouZhongShang
    ZhouZhongShang
  • ZhangJiGuang
    ZhangJiGuang
  • ChenZhiJie
    ChenZhiJie
  • NiuYong
    NiuYong
  • ZhaoJianDong
    ZhaoJianDong
Analysis of Piston Stressed Area of Epiroc's Hydraulic Rock Drills and Assessment of 3-Section Method
Hydraulic rock drill

Analysis of Piston Stressed Area of Epiroc's Hydraulic Rock Drills and Assessment of 3-Section Method

The article compiles diameter data of 11 dual-control rock drills and 4 rear-control rock drills from Epiroc. The ratio range of stressed areas of the piston in return and power strokes is determined. Based on the analysis of ratio data, the article points out using the design variables based on 3-

  • ZhouZhiHong
    ZhouZhiHong
  • DingHeJiang
    DingHeJiang
  • TianXiang
    TianXiang
Application of Three-arm Rock Drilling Trolley for Weak Surrounding Rock Tunnel
three-arm drilling jumbo

Application of Three-arm Rock Drilling Trolley for Weak Surrounding Rock Tunnel

In order to improve the quality of tunnel construction, especially the weak surrounding rock tunnel, and ensure its construction safety, the traditional excavation method is replaced by a fully computerized three-arm rock drilling rig, so as to speed up the tunnel construction progress and enhance

  • WangYueZhang
    WangYueZhang
  • LiMing
    LiMing
  • ShuChengZhi
    ShuChengZhi
  • ZhangLiShuang
    ZhangLiShuang
  • YanShaoZhe
    YanShaoZhe
Application Analysis of Three-arm Rock Drilling Rig in Full-section Excavation of Funiushan Tunnel
three-arm rock drilling rig

Application Analysis of Three-arm Rock Drilling Rig in Full-section Excavation of Funiushan Tunnel

In order to provide a safe and efficient construction environment for the tunnel, the three-arm rock drilling rig is commonly used for excavation operation in tunnel construction in recent years, this paper introduces the pre-entry preparation, construction characteristics and advantages of the

  • YuJinWei
    YuJinWei
  • GaoZhiLiang
    GaoZhiLiang
  • WangHaoShen
    WangHaoShen